Choctaw Erectors, Inc. has a staff of engineers, project managers and consultants that enables us to engineer picks in the most difficult of circumstances. We also have more than 100 ironworkers, engineers and supervisors.

Challenging projects that we have worked on in the past include a two-crane pick utilizing a 250-ton conventional crane with 4’ of boom clearance on an adjacent bridge and a 6’ of vertical clearance on the adjacent building. This project also used a 500-ton hydraulic crane with 17’ of clearance between the girder and the boom and a 3’ clearance between the crane and existing structures. The two picks had to be made in a five-hour time window.

 